• Model NO.: HZF-643
  • Type: Round Head
  • Head Style: Round
  • Grade: 12.9
  • Delivery Date: 15-30 Days
  • Surface Finish: Customized
  • Transport Package: Crate or Plywood Case or as Customers′ Request
  • Origin: Shandong, China
  • Material: Iron
  • Connection: Common Bolt
  • Standard: DIN, ANSI, GB, JIS, GOST, BSW
  • Size: Customized
  • Port: Qingdao Port
  • Trademark: HZF
  • Specification: SGS/ISO900/BV
  • HS Code: 84089452
Sand Casting for Scaffolding Jack Nut

1.Key specifications/special features:

Item: scaffolding accessories wing nut
Material: ductile ironSand Casting for Scaffolding Jack Nut
Surface: galvanized
Quality live: high quality
Manufacture: OEM is available
Category: formwork accessories
Process: casting/forged
Application: to fixed formwork frame

Place of Origin
Shandong, China
Main Material Q235 steel, iron
Surface finishes HDG, electric galvanized, Zinc plated + Bright Chromate 
MOQ 100pcs
Delivery lead time 15-25 days after deposit
Packing bulk, steel pallet, crate, ton bags
Payment terms T/T, L/C at sight
Logo mark as your require

2. Sand casting Process :
Sand Casting for Scaffolding Jack Nut

3.Inspection:
Inspection: in-house and third party
All the products are strictly inspected by operator and skilled QC with record put down.
Universal inspection tools: three-coordinates measuring machine,hardness tester, Height ruler, Depth ruler, Outside ruler, Venire Caliper, etc.
Sand Casting for Scaffolding Jack Nut

4. Shipment & Package 
Sand Casting for Scaffolding Jack Nut
FAQ
1.    How can I get the quotation?
Please send us information for quote : drawing, material, weight, quantity and request.
2.    How long will be taken for sample production ?
Sample: 20-30 days for making mold and sample production . The accurate time depends on your product.
3.    Can you accept Mini order ?
Yes . Mini order and trial order can be acceptable .
4.    What is your Payment Term ?
Mold cost : 100% TT advanced.
Main order: 40% deposit, balance 60% to be paid against the copy of B/L .
 
Contact us Today :
Sand Casting for Scaffolding Jack Nut

 

Casting Polyurethane Prepolymer

Casting Polyurethane Prepolymer used for making wheels, Sieve, machinery parts, sealing ring, PU rollers and other elastomers.

We provide customized products , polyester and polyether in PTMEG/PPG based materials

Casting polyurethane prepolymers involves a process where a liquid mixture of polyols and isocyanates is poured into a mold or container and allowed to cure or solidify. This process is commonly used in various industries such as automotive, construction, and manufacturing.
Here is a step-by-step guide on how to cast polyurethane prepolymers:
1. Prepare the mold: Clean the mold thoroughly and ensure it is free from any debris or contaminants. Apply a mold release agent to facilitate the easy removal of the cured polyurethane.
2. Measure and mix the components: Measure the desired amount of polyol and isocyanate components. The specific ratio will depend on the desired properties of the final product, which can be found in the product's technical data sheet. Pour the measured components into a clean mixing container.
3. Mix the components: Use a mechanical mixer or a high-speed drill with a mixing attachment to thoroughly mix the polyol and isocyanate components together. Make sure to mix for the recommended amount of time specified by the manufacturer to ensure complete homogeneity.
4. Degassing: After mixing, it is important to degas the mixture to remove any trapped air bubbles. This can be done by placing the mixture in a vacuum chamber and applying vacuum pressure for a specified period of time. Alternatively, a vacuum degassing unit can be used.
5. Pouring the mixture: Once the mixture is properly degassed, pour it into the prepared mold or container. Take care to avoid introducing any additional air bubbles during the pouring process.
6. Curing: Allow the poured mixture to cure at room temperature or, if necessary, in a temperature-controlled environment. The curing time will vary depending on the specific polyurethane prepolymer used and the desired hardness or flexibility of the final product. Follow the manufacturer's recommendations for curing time and temperature.
7. Demolding: After the polyurethane has fully cured, carefully remove it from the mold or container. Use caution to prevent any damage to the cured part.
8. Post-curing (optional): Depending on the specific polyurethane prepolymer used, post-curing may be required to optimize the material's properties. This can be done by subjecting the cured part to elevated temperatures for a specific period of time.
It is important to note that casting polyurethane prepolymers requires proper safety precautions, such as wearing appropriate personal protective equipment (PPE) and working in a well-ventilated area. Always follow the manufacturer's instructions and guidelines for handling and working with polyurethane prepolymers.

Good Wheel Polyurethane Prepolymer,Casting Polyurethane Prepolymer,Casting Pu For Elastomers,Custom Polyether Polyurethane Prepolymer

XUCHUAN CHEMICAL(SUZHOU) CO., LTD , https://www.xuchuanpu.com